Blog 
Monday, 28 September 2009


The local building inspector approved the footings and we were able to pour the foundation with concrete.  After the concrete set, John D. and Harvey completed the foundation with block, and new pressure treated sills.  When the foundation is completed the temporary beam supports can be removed.
POSTED BY: GKS AT 08:22 am   |  Permalink   |  0 Comments  |  E-mail this
Comments:

Post comment:
Name:
 *
Email Address:

Message: (max 750 characters)
*
Verify image below:
*
* Required Fields
Note: All comments are subject to approval. Your comment will not appear until it has been approved.


Tom Michalik Builders LLC
1500 Kings Hwy. N., Suite 210C
Cherry Hill, NJ  08034
Phone: (856)857-9265
Email: tmichalikbuilder@yahoo.com
Site Powered By
eBizWebpages.com
Online Website Design